Projects

Year Investor/
Customer
Name Range
2017 ZW LHOIST S.A. / BMH PROJEKT

INVESTOR: Lime Plant Lhoist S.A., ul. Świerczewskiego 5, 46-050 Tarnów Opolski


NAME OF INVESTMENT: CONSTRUCTION OF A FREE-STANDING INDUSTRIAL SYSTEM FOR DEDUSTING GAS FROM SHAFT FURNACES NO. 3/5/6

INVESTMENT PLANS:  Constructing an industrial system for dedusting gas from shaft furnaces no. 3, 5, 6, consisting of a bag filter, located on a planned steel supporting structure, dedusting pipelines with supports, a steel chimney and foundations of the filter’s, ventilator’s and noise silencer’s supporting structure.

SCOPE OF DESIGN WORKS:  A multi-modal construction and executive design, covering all the planned constructions, as well as a technical opinion on the possibility of fitting the designed structures on the furnaces.


PROJEKT BUDOWLANY, PROJEKT WYKONAWCZY
2017 GÓRAŻDŻE – EKOCEM / B.P. PROACEM

INVESTOR: Górażdże cement plant, ul. Cementowa 1, Chorula, 47-316 Górażdże


NAME OF INVESTMENT:  Coal dust in the EKOCEM plant. Construction of coal dust dosing system with a furnace in the EKOCEM plan

SCOPE OF DESIGN WORKS:

  1. Station for the coal dust container – a reinforced concrete support.
    1. Construction design (static calculations, drawing documentation)
    2. Executive design (drawing documentation, list of materials)
  2. 2. The furnace’s supporting structure with platforms.
    1. Construction design (static calculations, drawing documentation)
    2. Executive design (drawing documentation, list of materials)

PROJEKT BUDOWLANY, PROJEKT WYKONAWCZY
3. DEPOT HALL – POTOK GM. SZYDŁÓW

NAME OF INVESTMENT:  Reconstruction of a warehouse and changing the purpose of its usage into a vehicles disassembly and repairs station and a station for segregation and recycling of secondary wastes, a warehouse with social and office premises.

SITE: : A depot hall with a skeleton structure, prefabricated, of reinforced concrete (sports depot hall system).

SCOPE OF DESIGN WORKS: 

  • Technical expertise:
    • Site’s inventory
    • Reinforcement detection
    • Static and strength calculations
    • Elaboration of repairs and enforcement plan, as well as the building’s maintenance program
  • Construction design in the structural area
IP KWIDZYN / SBB ENERGY S.A. / BMH PROJEKT

INVESTOR: INTERNATIONAL PAPER KWIDZYN SP. Z O.O. ul. Lotnicza 1, 82-500 Kwidzyn


NAME OF INVESTMENT:  CONSTRUCTION OF A FLUE GAS DENITROGENATION UNIT FOR COAL BOILERS OP 140 NO. 1, 2, 3.

DESIGN TOPIC:  Work organization plan for the construction of technical structure and social facilities together with the networks of the flue gas denitrogenating systems for coal boilers OP-140 No. 1, 2 and 3 in the cogeneration plant for the International Paper Kwidzyn Sp. z o. o. plant.

SCOPE OF DESIGN WORKS:  Elaboration of the technology of replacing the existing structures and technological systems and designing auxiliary structures for shifting weight, supports for winches and hoist beams.

HALA – KRAKÓW UL. BAZAROWA

INVESTOR:  P.H.U.P. TRANS-SUD, ul. Kadrowa 53, Młodziejowice, 32-091 Michałowice

NAME OF INVESTMENT:  Construction of a service building (a warehouse – workshop – parking depot hall) with the necessary infrastructure at Bazarowa Street in Cracow.

INVESTMENT PLANS: Construction of a depot hall with a steel skeleton structure, positioned on a reinforced concrete slab and supported by foundation piles.

SCOPE OF DESIGN WORKS:  The construction and the executive designs in the foundations area, indirect foundation and the steel structure.

CONSEKO-SAFEGE S.A. / PIB CONSTRUCTOR

INVESTOR: RĘDZINY COMMUNE OFFICE, ul. Wolności 87, 42-242 Rędziny 

NAME OF INVESTMENT:  CONSTRUCTION OF A BIOLOGICAL-MECHANICAL WATER TREATMENT PLANT WITH THE CAPACITY OF 2000 m3/d IN THE TOWN OF KAROLINA NO. 27 RĘDZINY COMMUNE

SCOPE OF DESIGN WORKS:

Within the frames of the investment construction and executive designs were developed in the structural area for the facilities:

  • Facility No. 01/02 – the building of the sand separator’s sieve. The blower station.
  • Facility No. 07 – the building of the mechanical sludge dewatering. The social and the sanitary facilities buildings
  • Facility No. 09 – a covered square for storing the dewatered sludge after the hygienisation process

All facilities were designed in the technology of steel skeleton structures

EDF GDYNIA / SBB ENERGY S.A./ BMH PROJEKT

INVESTOR: EDF Polska S.A. Oddział Wybrzeże – Cogeneration plant in Gdynia, ul. Pucka 118, 81 – 154 Gdynia


NAME OF INVESTMENT:  Design, execution and construction of a primary methods system and SNCR on two BC-50 boilers.

INVESTMENT PLANS: 

  • TASK I: Construction of two storage tanks for urea with the capacity of 2x22m3
  • TASK II: Construction of a technological system for lowering the emission of nitrogen oxide from boilers K6 and K7 – reconstruction of the boiler house (ventilators with foundations), technological systems.

SCOPE OF DESIGN WORKS:

Within the frames of the investment construction and executive designs were developed in the structural area for the facilities:

  • TASK I:
    • Design of tanks’ foundations
  • TASK II:
    • Design of founding two ventilators including micropiling
    • Design of new hot air channels with supporting structures
    • Design of air recirculation channels with supporting structures

BENTLEY BE INSPIRED AWARD 2017 in the category: BIM Advancements in Construction

KRAKÓW-DĄBROWSKIEGO

INVESTOR: Dąbrowskiego Sp. z o.o., 41-500 Chorzów, ul. Katowicka 125/1a


NAME OF INVESTMENT: Construction of a multi-family residential building with service premises on the ground floor and an underground parking lot with internal water supply and sewage systems, central heating, electrical and mechanical ventilation and external sanitary and rain sewage systems, construction of an exit from Dąbrowskiego Street, reconstruction of the cable line nN on plots No. 259/3, 544/7, 544/15 area 13, evidence unit Podgórze at Dąbrowskiego Street in Cracow.

FACILITY: A multi-family residential with an underground parking lot with a reinforced concrete structure with a slab-and-wall system

SCOPE OF DESIGN WORKS:

  • Construction design in the structure area

THE BUIDLING’S CONSTRUCTION – MODEL

Dyckerhoff Polska Sp. z o.o. / BMH PROJEKT

INVESTOR: Dyckerhoff Polska Sp. z o.o., ul. Zakładowa 3, 26-052 Nowiny


NAME OF INVESTMENT:  Transport of flour to the exchangers. Development of the Beumer elevator.

INVESTMENT PLANS: Positioning the 58-meter-high BEUMER elevator near the flour silo. Construction of the elevator’s foundation’s reinforced concrete frame structure and installation of steel structures of the elevator’s side supports, anchored to the silo’s coat.

SCOPE OF DESIGN WORKS:

  • Executive design of the steel structure
    • Static calculations
    • Workshop documentation
    • List of materials
TM TECHNOLOGIE SP. Z O.O. / 4D PROJECT

INVESTOR: TM TECHNOLOGIE, MORAWICA 355, 32-084 MORAWICA


NAME OF INVESTMENT:  Development and reconstruction of a production depot hall with a social and office area and internal systems

Morawica 355, 32-084 Morawica

SCOPE OF DESIGN WORKS:

  • Executive design of the hall’s roof’s steel structure
    • ES modelling
    • Static calculations – optimization of the roof’s steel structure with regard to the used materials
    • Spatial modeling
    • Workshop documentation
    • List of materials

ZW LHOIST GÓRAŻDŻE / BMH PROJEKT

INVESTOR: Lhoist S.A Lime plant. ul. Świerczewskiego 5, 46-050 Tarnów Opolski


NAME OF INVESTMENT: RECONSTRUCTION OF THE MAERZ FURNACE DEDUSTING SYSTEM

Górażdże Production Unit, ul. Fabryczna 22, Bukowa, 47-316 Górażdże

INVESTMENT PLANS:  Reconstruction of the Maerz furnace dedusting system in the Górażdże Production Unit, involving replacement of the existing filter for a SCHEUCH filter. The reconstruction also includes the filter’s supporting structure and the “clean” and “dirty” gas pipelines. A new noise silencer and new ventilator will be mounted.

SCOPE OF DESIGN WORKS:

  • Technical expertise of the existing building
  • Construction design in the structural area
  • Executive design in the structural area
SBB ENERGY S.A. ul. Łowicka 1, 45-324 Opole / BMH PROJEKT ul. Żywiecka 30-427 Kraków

INVESTOR: Energy company “Jastrzębie” S.A., ul. Rybnicka 6c, 44-335 Jastrzębie-Zdrój


NAME OF INVESTMENT:  Construction of a flue denitrogenization system for boiler WP-70 No. 5 in the “Zofiówka” cogeneration plant.

INVESTMENT PLANS:  Modernization of the WP-70 No. 05 boiler in the “Zofiówka” cogeneration plant, including mounting of SOFA air intake ducts to the furnace and mounting additional service platforms.

SCOPE OF DESIGN WORKS:

  • A multi-modal construction design
  • Executive design in the structural area

SBB ENERGY S.A. ul. Łowicka 1, 45-324 Opole / BMH PROJEKT ul. Żywiecka 30-427 Kraków

INVESTOR: BĘDZIN Sp. z o.o. cogeneration plant, ul. Małobądzka 141, 42-500 Będzin

NAME OF INVESTMENT:  Construction of a flue desulphurization and denitrogenization systems in the BĘDZIN Sp. z o.o. cogeneration plant

DESIGN TITLE:  Plan of organization and technology of conducting construction works

REMAK ROZRUCH S.A. / BMH PROJEKT

INVESTOR: Group of powerplants Zespół Elektrowni Pątnów-Adamów-Konin S.A., ul. Kazimierska 45, 62-510 Konin


NAME OF INVESTMENT: Modernization of the dust boiler of block No. 1 and 2 in Pątnów I cogeneration plant to reduce the emission of NOx

SCOPE OF DESIGN WORKS PROJEKTOWYCH:
The scope of works included developing the technology of replacing the damaged elements of the boiler’s bearing structure, in particular, designing the temporary structures, compensating the damaged elements

  1. 1. BOILER NO. 1
    1. Design for stabilizing and strengthening the piles in the b* axis of boiler K1 on levels from +44,00 to +57,00
    2. Design for stabilizing and strengthening the piles in the Cx axis of boiler K1 on levels from +44,00 to +57,00
    3. Installation of the conventional and secondary super-heaters.
  2. BOILER NO. 2
    1. Instruction for conducting works while securing the remains and demounting the panels and chambers of the bulkhead super-heater of boiler op 650 No. 2.
    2. Technology of replacing the beams and piles of boiler K2 on levels from + 37,95 to + 59,30.
    3. Executive design for the replacement and repair of beams on level +38,00 and the pile on level +33,00.
    4. Design for mounting the bulkhead super-heater of boiler op 650 No. 2.
    5. Executive design for the contracting the temporary platform on level +28m

 

ENEA KOZIENICE / CAMA/ 4D PROJECT

INVESTOR: ENEA Wytwarzanie S.A., Świerże Górne, 26-900 Kozienice


NAME OF INVESTMENT:  CONSTRUCTION OF THE FLUE DESULPHURIZATION SYSTEM (IOS IV) IN ENEA WYTWARZANIE S.A. 

FACILITY: EC KOZIENICE POWERPLANT – CHIMNEY NO. 3

DESIGN TOPIC: REPLACEMENT TECHNOLOGY FOR THE DEMOLITION OF THE CHIMNEY H=300 M

SCOPE OF DESIGN WORKS: Static calculations and the executive design of the mounting platform structure, located on the top of the chimney.

TRZYSKAWICA S.A. / B.P. PROACEM

INVESTOR: Trzuskawica S.A., Sitkówka 24, 26-052 Nowiny


NAME OF INVESTMENT: Dedusting system for curing ovens for 100C lime burning.

SCOPE OF DESIGN WORKS:  An executive design for the structure of the pipeline supporting pylon.

4D PROJECT ul. Lwowska 150A 32-820 Szczurowa

INVESTOR: The Częstochowa Motorcycle Club Włókniarz S.A., ul. Olsztyńska 123/127, 42-200 Częstochowa


NAME OF INVESTMENT: SUPPORT STRUCTURE OF A LED SCREEN AT THE Częstochowa Motorcycle Club Włókniarz S.A.

SCOPE OF DESIGN WORKS: Executive design in the structural area of the steel support structure for mounting a 29m2 TV screen

ARCHINOVA

NAME OF INVESTMENT: CONSTRUCTION OF A RECREATIONAL BUILDING WITH INTERNAL WATER SUPPLY AND SEWAGE SYSTEMS, GAS, CENTRAL HEATING, MECHANICAL VENTILATION, SIX PARKING SPACES, LIQUID WASTE TANK, SEWAGE CONNECTION, AN AERIAL ELECTRICAL SYSTEM RAIL PAD.

SCOPE OF DESIGN WORKS: Construction and executive design in the structural area

 

ARCHINOVA

NAME OF INVESTMENT: CONSTRUCTION OF TWO SERVICE BUILDINGS: A DANCE SCHOOL AND A RESTAURANT, WITH INTERNAL WATER SUPPLY AND SEWAGE SYSTEMS, ELECTRICAL SYSTEM, CENTRAL HEATING, MECHANICAL VENTILATION, PARKING SPACES, EXTERNAL FIRE PROTECTION WATER TANK, TWO LIQUID WASTE TANKS, A DUG WELL AND GROUND LEVELLING.

FACILITY: Complex of service buildings with a reinforced concrete skeleton structure with a multi-sidelong wooden roof

SCOPE OF DESIGN WORKS: Construction and executive design in the structural area.

ARCHINOVA

NAME OF INVESTMENT: DESIGN OF TWO SERVICE BUILDINGS – SHOPS WITH INTERNAL WATER SUPPLY AND SEWAGE SYSTEMS, GAS SYSTEM, ELECTRICAL SYSTEM, TWO LIQUID WASTE TANKS, WATER CONNECTION, GAS CONNECTION AND ENN CONNECTION WITH AN EXIT FROM THE DISTRICT ROAD.

FACILITY: Two semi-detached buildings with a reinforced concrete skeleton structure with a multi-sidelong wooden roof.


ABBEY PYNFORD FOUNDATION SYSTEMS LTD / 4D PROJECT

Development of the reinforcement documentation of foundation slabs.

BIURO GEODEZYJNO PROJEKTOWE Gustaw Galus Złotniki 132, 32-125 Wawrzeńczyce

Construction designs and technical expertise of single-family residential buildings and auxiliary and service buildings in the structural area.

4D PROJECT

A support structure for mounting a LED advertisement Wrocław

4D PROJECT

Structure of an advertisement 17m pylon, Kraków for CASTORAMA Polska Sp. z o.o. ul. Krakowiaków 78, 02-255 Warszawa

4D PROJECT

A support structure for mounting a LED advertisement for NEGRA SPORT Robert Jastrzębski ul. Myśliwska 68 30-718 Kraków
Executive design

4D PROJECT

A support structure for mounting light advertisement for ING Bank Śląski S.A. ul. Sokolska 34, Katowice

ZMG „GLINIK” Sp. z o. o.

INVESTOR: Mine Machinery Plant “GLINIK” Sp. z o.o., ul. Michalusa 1, 38-320 Gorlice


NAME OF INVESTMENT: THERMAL MODERNIZATION OF DEPOT HALL’S NO. 1 ROOF IN the Mine Machinery Plant “GLINIK” Sp z o. o. 38-320 GORLICE, ul. MICHALUSA 1

Reconstruction of the roof to reduce the load and adjust its structure to the binding norms, as well as improving the parameters of its thermal isolation.

SCOPE OF DESIGN WORKS: 

  • Technical expertise of the hall’s existing structure
  • Construction design in the structural area
  • Executive design in the structural area

 

Regional Hospital in Tarnobrzeg

INVESTOR: The Regional Hospital of Zofia nee Zamoyska Tarnowska in Tarnobrzeg.


NAME OF INVESTMENT:Construction of garages for the ambulances with a vehicle technical inspection center up to 3.5t and partial adaptation of building “K” premises for technical facilities.

SCOPE OF DESIGN WORKS:

A multi-modal construction design with elements of executive design, Construction and executive design

28. Regional Hospital in Tarnobrzeg

INWESTOR: The Regional Hospital of Zofia nee Zamoyska Tarnowska in Tarnobrzeg.


SCOPE OF DESIGN WORKS:

Developing the construction inventory of the historical A pavilion
Developing the construction inventory of the historical B pavilion

3G NETWORK SERVICES

INVESTOR: P4 Sp. z o.o., ul. Pileckiego 63, 02-781 Warszawa


SCOPE OF DESIGN WORKS: Technical documentation for cellular base stations (UMTS) in the structural area.
Construction and technical documentation.

Euro-Fenetre Sp. z o.o.

INVESTOR: POLISH ACADEMY OF SCIENCES- WŁ. SZAFER INSTITUTE OF BOTANY, ul. LUBICZ 46, 31-512 KRAKÓW


NAME OF INVESTMENT: Development of the field station of the Institute of Botany of the Polish Academy of Sciences in Szarów

INVESTMENT PLAN:Construction of a residential and technical building, located in Szarow on plot No. 278 with the area of 337 m2. The building design resembles two wings with identical volume, inclined towards each other at 45 degrees and connected with the middle part in the shape of an irregular pentagon. The designed building is two-level with a full basement

SCOPE OF DESIGN WORKS:

  • Executive design in the structural area:
    • Static calculations in order to optimize the structure
    • Executive drawings of the reinforced concrete structures/em>
    • Workshop and mounting drawings of the steel structure
CAPNOR POLAND Sp. z o.o.

INVESTOR: Group LOTOS, ul. Elbląska 135, 80-718 Gdańsk


FACILITY: Rafinery GDAŃSK – HDS PLANT – a flyover in the compressor building. Workshop documentation